Skip to content
Project 2 Construction

Brackley · Completed

Brackley flood renovation

Finished hallway in the Brackley house, with a carpeted staircase, oak handrail and herringbone flooring.

The project

After flooding left this Brackley house badly damaged, it needed far more than a tidy-up. We started with a full strip-out, then put the house back together room by room, from fresh plaster and new floors to refitted bathrooms.

What we did

Every room was replastered and decorated, with new woodwork and oak doors throughout. We fitted new sockets and switches and swapped the pendant lights for spotlights. Herringbone flooring now runs through the hallway, kitchen, utility, WC and office, with carpet on the stairs, landing and bedroom. In the utility, new units and an oak worktop sit around the customer’s own Belfast sink, which we kept and reused. The staircase has a new oak handrail and spindles, with the newel posts clad in oak, and the en suite, bathroom and WC all have new sanitaryware and tiling.

From the strip-out to the finished rooms.

Silent walk-through of the finished Brackley house. Watch the original reel on Facebook

Have something similar in mind?

We would be glad to hear about it. Tell us a little about the property and what you would like to do.